Note: These pages contain large files. Go to the
Low Resolution Test Results web page if you have a phone modem.
The ICC test effort consists of four separate programs:
Non-Accelerated Corrosion Control
The amount of time it takes for rust to develop on a treated surface
The amount of time required for a penetrating oil to unfreeze a frozen fastener
The amount of shrinkage or swelling associated with exposure to a corrosion control product
500-hour ASTM B-117-90 Salt Fog (Spray) Test Results